Thread: Hypertufa Slab
View Single Post
Old 20-Jan-2006   #25
pootsie
The Cat's Apprentice
pootsie's a bonsaiTALK supporter! Click Here to find out how you can be one too!
 
pootsie's Avatar
 
Join Date: May-2004
Location: Columbus o-HI-o
Country: USofA
Posts: 3,065
Quote:
Originally Posted by EarthgirlOK
How did you get permission from the building super to bring in a concrete mixer? Honestly, tell us how the mixing was done-in one big batch?

Good job.

Ta, Earthgrrl!

The mixing was done in a big mortar-box outside (a member owns the mortar box). The mixing was done in 3 or 4 batches and brought in for individuals to use, carrying the small portions in cat-litter buckets (hmmm, wonder where they got those ).

We also spread plastic sheets over the floor to protect the carpet. We actually didn't leave a mess behind at all, surprisingly.

If I recall, the recipe we used included peat and vermiculite and sand, and a little latex admix, but I didn't do the mixing. We had hardware cloth and copper wire to use for rebar. Chopsticks and dowel for drain/wire holes. Rubber gloves. fun fun fun

pootsie
__________________
p.s. My cat is a bonsaiTALK Master.
Columbus Bonsai Society
pootsie is offline   Reply With Quote